Commercial Stucco Installation in Marietta
Three-coat portland cement stucco is a durable, traditional finish that suits Marietta’s commercial buildings, from downtown infill to new multifamily. We install it over a proper weather barrier and lath, with control joints and weep screed placed where the wall needs them.
- Three-coat cement stucco
- Weather barrier & lath
- Control joints & screed
- New work & re-clads
Request a commercial quote
Marietta commercial stucco & EIFS. Property managers, boards, owners & builders.
Hard coat stucco with a Marietta setting
Hard coat stucco fits Marietta. Around the historic downtown it sits comfortably beside older brick and painted masonry, and on new office, retail and apartment buildings it gives a solid, impact-resistant wall that holds up to parking lot traffic and Georgia weather. The finish only lasts, though, if everything under it is right.
Our installations start at the substrate. We confirm the sheathing is sound and dry, install a two-layer weather barrier lapped shingle-style, and tie it into window and door flashing before any lath goes up. Lath is fastened to framing at the right spacing, with corner aid and casing beads at openings. Weep screed goes at the base of the wall above grade so water behind the stucco can get out. Control joints are laid out to break large panels into sections that can move without cracking.
Scratch, brown and finish coats each get the curing time they need, adjusted for Marietta’s summer heat and winter cold. Skipping that time is the most common reason new stucco cracks in its first year.

Every layer of a commercial stucco wall
A finished three-coat wall is a little under an inch thick, but it is built from six separate parts. Skip one and the others cannot make up for it.
Weather-resistive barrier
Barrier lapped top over bottom, so water that gets past the stucco runs down and out instead of into the sheathing.
Metal lath
Self-furred lath fastened into the framing and held off the barrier, so the scratch coat wraps around it and locks in.
Weep screed & casing beads
A weep screed at the base lets water drain out; casing beads finish the edges at windows and storefronts with room for sealant.
Control & expansion joints
Joints break long elevations into panels and isolate floor lines, so building movement shows up at the joint instead of as random cracking.
Flashing & kick-outs
Head flashing over openings, parapet and coping details and kick-outs at roof-to-wall lines go in with the barrier, where they can be lapped correctly.
Three coats, properly cured
Scratch, brown and finish coats applied in sequence, with base coats kept damp and given time to cure before the next goes on.
New buildings, additions and re-clads
On new construction we coordinate with the general contractor, framer, window and storefront installers and roofer so barrier and flashing go in in the right order. On an addition, the new wall has to tie into the existing stucco without a visible seam, which means matching texture and planning a joint where old meets new.
A re-clad is the biggest job, and on an occupied building it is planned elevation by elevation: the failed cladding comes off, we inspect and replace damaged sheathing, then install a complete new system before moving on. If the existing stucco is sound and the goal is a new look, a recoat or color change may be all the building needs.
| Project | What’s involved | Key detail |
|---|---|---|
| New constructionWhole building | Barrier, lath, three coats | Flashing sequenced with trades |
| AdditionNew wing or tenant space | Full system on new framing | Texture tied into existing |
| Re-cladFailed cladding off | Sheathing checked, new system | Phased around occupants |
| Partial elevationOne facade or tower | New system to a clean break | Joint at a corner or band |
How a commercial stucco wall is built
Three-coat stucco takes time because each coat has to cure. Much of the schedule is curing, not labor, and that time is what makes the wall last.
Review & prepare
We review drawings and joint layout, check the sheathing, install the weather barrier from the bottom up and integrate it with window, storefront and roof flashing.
- Joint layout confirmed
- Barrier lapped correctly
- Kick-outs installed
Lath & accessories
Weep screed, casing beads, corner aids and control and expansion joints go on with the lath, fastened into the framing and laid out to suit each elevation.
- Screed set above grade
- Joints laid out by panel
- Lath fastened to framing
Three coats & cure
The scratch coat is scored and kept damp, the brown coat is floated flat and allowed to cure, then the finish coat sets the specified texture and color.
- Base coats moist-cured
- Cure time between coats
- Finish to the spec
Bidding new construction or a re-clad?
Bring us in before the windows go in. Flashing, barrier and joint details are easiest to get right early.
Where new hard coat goes up in Marietta
Most of our new stucco work here is on infill, additions and multifamily buildings that need to look right next to what is already there.
Infill near Marietta Square and along the streets leading into downtown often has to respect the character of older buildings around it, and exterior materials there may be reviewed by the city. Elsewhere in Marietta, new apartment buildings, medical offices and restaurant pads along the corridors use hard coat for its durability. In both cases, the details at grade, windows and roof edges matter more than the texture.
Downtown infill
New buildings and additions near the Square that need to sit well beside older facades.
Multifamily
Apartment and condominium buildings where stucco takes daily wear at entries and stair towers.
Pads & outparcels
Restaurant and retail pads along Cobb Parkway and Roswell Road that take vehicle impact.
- Marietta Square
- Church Street
- Whitlock Avenue
- Cobb Parkway
- Roswell Road
- Franklin Gateway
- Kennesaw
- Smyrna
- Powder Springs
- Acworth
Stucco installation FAQ for Marietta
What Marietta owners, developers and contractors ask before a new stucco project.
Does new stucco near Marietta Square need design approval?
Who handles permits for stucco on a Marietta project?
Why use three-coat stucco instead of a one-coat system?
How long does three-coat stucco take?
Why does new stucco need control joints?
Plan new stucco in Marietta
Send plans or describe the project. We will review the wall details and send a written proposal.