
- Home
- Services
- Envelope Inspections
EIFS & Stucco Inspection in Marietta, GA
Buying, refinancing or budgeting reserves on a Marietta property? A moisture survey and written condition report tell you what the stucco or EIFS is hiding before you commit money to it.
- Moisture probe surveys
- Water testing at openings
- Due diligence & reserves
- Written condition reports
Request a commercial quote
Marietta commercial stucco & EIFS. Property managers, boards, owners & builders.
Marietta properties change hands with their walls
Marietta has a steady market in older commercial and multifamily property: suburban office buildings, neighborhood retail centers, garden-style apartment communities and condominiums, many of them clad in EIFS or stucco decades ago. When one of those properties is bought, refinanced or repositioned, the envelope is often the largest unknown in the budget. A facade can look clean and still have wet sheathing behind it at every window.
Our inspections are built to answer that question. We review the elevations, record the cladding type and the condition of sealant, flashing and terminations, and take moisture probe readings at the locations where water typically gets in: below window corners, at roof-to-wall transitions, along the base of the wall and around penetrations. Where a leak path is unclear, we water test.
You receive a written report with photos, readings by location and a plain explanation of what we found, along with a repair scope that separates urgent water intrusion from routine maintenance. Owners, buyers, lenders and boards use it to price the work and plan when to do it.

Envelope inspections in Marietta
Every survey follows the same idea: test where water gets in, record what we find, and explain it in plain language.
Moisture probe surveys
Probe readings at high-risk locations across each elevation, recorded by location; each hole is sealed afterward.
Water testing
Controlled water applied to a window, storefront, joint or flashing confirms whether that detail is the leak path before anything is opened.
Due diligence surveys
Condition of the stucco or EIFS envelope documented for buyers and lenders before an acquisition or refinance closes.
Reserve study support
Condition findings by elevation that help condo and HOA boards and their reserve specialists plan envelope work over time.
System identification
We confirm whether the wall is hard coat stucco, barrier EIFS or drainable EIFS, because that decides how it is repaired.
Pre-repair baselines
A documented baseline before a repair, recoat or sealant program is scoped, so the scope is built from evidence.
Choosing the right level of testing
Not every building needs the same depth. A visual survey can spot failed sealant, open parapet caps, missing flashing and cladding run below grade, but it can’t tell you whether the sheathing is wet. Probing answers that. Water testing goes one step further and proves which detail is letting water in.
For an acquisition, a refinance or a reserve study, a probe survey across representative areas of every elevation is usually the right level. If a tenant has reported a leak in one location, a focused survey of that area may be enough. We recommend the level that fits your decision and quote it in writing before we start.
| Survey | Best for | You get |
|---|---|---|
| Visual survey | Routine check, budgeting | Details to watch |
| Focused probing | One reported leak or stain | Extent of damage |
| Building-wide probing | Due diligence, reserves | Moisture map by elevation |
| Water testing | Leak with unclear source | Leak path confirmed |
How an envelope survey works
We coordinate access, tenant notice and any lift or ladder work with you before the survey day.
Walk & identify
We walk every elevation, identify the stucco or EIFS system, and note sealant, flashing, parapets, penetrations and clearance at the base.
- System identified
- Risk areas marked
- Visible defects photographed
Probe & test
Probe holes go in at the marked locations and readings are recorded. Where needed, we water test a detail to confirm the leak path.
- Readings by location
- Holes sealed afterward
- Water tests where needed
Report & review
You get a written report with readings, photos and findings by elevation, and we review it with you, your board or your lender’s consultant.
- Photos of each issue
- Urgent vs. planned items
- Repair options if needed
Working against a due diligence deadline?
Inspection periods are short. Call early so access can be arranged and the report is in hand before your deadline.
Who orders inspections in Marietta
Most envelope surveys we perform here start with a transaction, a reserve study or a leak that keeps coming back.
Redevelopment along corridors like Franklin Gateway, steady turnover of office and retail property near I-75, and aging condominium communities across Marietta and East Cobb all create the same need: a clear picture of the wall before decisions are made. We write reports for the person who has to act on them, whether that is a buyer’s team, a lender’s reviewer or a board presenting numbers to unit owners.
Buyers & lenders
Pre-purchase and refinance surveys on office, retail and multifamily property, with readings and a priced scope.
Boards & reserves
Condition surveys that give condo and HOA boards real numbers for reserve planning.
Repeat leaks
Targeted water testing where tenants or residents keep reporting the same leak.
- Marietta Square
- Franklin Gateway
- Cobb Parkway
- Delk Road
- Powers Ferry
- Roswell Road
- East Cobb
- Kennesaw
- Smyrna
- Acworth
Envelope inspection FAQ for Marietta
What Marietta buyers, owners and boards ask before ordering a survey.
How much notice do you need for a Marietta due diligence inspection?
Can you inspect an occupied Marietta apartment or condo community?
Does moisture probing damage the wall?
What is the difference between a visual inspection and a moisture survey?
Will the report include repair costs?
Order a survey before you commit
Tell us about the Marietta property, your timeline and who the report is for. We will scope the inspection and confirm access.


